why we use minimum cement as given in IS mix design code
Answer Posted / manoj patel
If we do not use minimum content of cement say for example
of M20 concrete; then it will not serve the purpose ie to
achieve comp.strength desired/intended for;
Hence min req. is the lower limit of material content.
Like minimum calory req. by our body to sustain life;
regardless of age, type of work, etc.
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
what is the name of shuttering oil used in oman
What is Architect-Prepared Contract?
How to find out slope footing concrete
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
Which is the most prominent tower of world?
how to determine H- zone in a column? where it will occur?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
What are the uses of layer?
How to do base isolation using ETABS software?
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork