Answer Posted / manoj patel
Theoritically;
> for mix Proportion 1:3;
> 12mm thick,
> 1m2 plaster will require 6.20kg of cement.
Assumption - No Wastage
Plaster Yield - 70%
Is This Answer Correct ? | 19 Yes | 5 No |
Post New Answer View All Answers
What are the ingredients of pre-stressed concrete?
IS code for Rolling Margin of steel
What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
What is the use of extruded feature in solidsworks?
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
Tell me about triple point of water.
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
How much does the leaning tower of pisa lean?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.