Quantity of cement in kgs for different proportions and
different thickness in plastering work per 1 sq.m. And how
to estimate this quantities.

Answer Posted / manoj patel

Theoritically;
> for mix Proportion 1:3;
> 12mm thick,
> 1m2 plaster will require 6.20kg of cement.

Assumption - No Wastage
Plaster Yield - 70%

Is This Answer Correct ?    19 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the ingredients of pre-stressed concrete?

795


IS code for Rolling Margin of steel

1920


What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.

1929


what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982

1674


What is the use of extruded feature in solidsworks?

784






How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.

3713


how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend

1606


How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)

1523


Tell me about triple point of water.

687


Why Is Propping Required For Long Structures Once The Form Work Is Removed?

704


Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?

1697


how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.

1977


I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com

1863


How much does the leaning tower of pisa lean?

627


suppose that  156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.

2317