in thermal power plant the steam produced is made to cool
after falling on the turbine blades.
my question is why this is done while the same is needed to
heat up again.
"jab pani ko wapis garam hi karna hai to thanda kyu karte
hai"
Answer Posted / hariis
its becoz its very difficult to heat an already heated
steam... becoz heat always flows from a high temperature
to low temperature easily..
so it is necessary to cool down the steam before reheating
| Is This Answer Correct ? | 5 Yes | 6 No |
Post New Answer View All Answers
what is parellel power factor correction?
What is electrical diversity factor in electrical installations?
how braking & making capacity of circuit breaker is calculated?
why US countries maintains 110v and 60HZ
Can you please explain creepage distance in detail, for a 6.6kV cable head what must the distance be and how do you determine it?
Define average demand?
What are the internal and external faults?
why the check zone and main zone are used for Busbar Protn. scheem?
Explain the terms real power, apparent power and reactive power for ac circuits and also the units used.
I am EEE student i want to improve my core side skills.how cn i approach it?
Define maximum demand?
What is the current carrying capacity of 35sq.mm flexible cable?
what is the difference b/w pvc cu conductor and cu breaded wire..?
please send me previous year questions of jspl through which i could prepare myself for the test.
Logic using 1 kV or 1,1 kV grade in house wiring Low voltage cable. Explain/suggest? some use 1kV and some prefer 1.1kV grade insulation low voltage cable why??