in thermal power plant the steam produced is made to cool
after falling on the turbine blades.
my question is why this is done while the same is needed to
heat up again.
"jab pani ko wapis garam hi karna hai to thanda kyu karte
hai"
Answer Posted / lalit vaidya
According to me when the residual hot air is there then it can not recycle as it is because it require the that much temp to fall on the blade hence it is make hot again
| Is This Answer Correct ? | 2 Yes | 5 No |
Post New Answer View All Answers
can any tell me why slope 40% and 80% is calculated in differential protection?
what will happen if frequency is below 50 hz?
How to configure the drives in PLC, through Profibus commnication. And to how to address it?
Is it required to lay 2 runs of GI wires along with armoured cables from one power DB Machines of higher rating?
What will happened if the neutral of secondary of Xformer ( Star point) Note it's above KVA rated Xformer
What is Delta Connection? What is meant by Forward Delta & Reverse Delta & How Will be the Connection in Power Transformers?
What is the exact formula for one weber of magnetic flux?
how to calculate the battery AH
how to calculate energy of 3-phase motor?
Hi,I am working in abroad for more than 3 years in a company operating with 11kv and 6.4 MW power. I need c licence in India,can I? some other says only i can get if i work for 2 years in india only! anybody kindly clarify by doubt.Thanks
what is residuel magnetism. and how order lead acid batteries for 24 volt. emergency lighting system.
What is the use of mc( moving coil) in dc voltmeter and dc ammter and what is the use of ( moving iron)in ac voltmeter nd ac ammeter
can anyone tell me can the electromagnetic waves can be reflected back?if so how &by which material it can be reflected back?please tell me so that it can help to my wireless power trasnmission device.
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram
what is the excess air in furnace