Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what"s the formula for circumference?

Answer Posted / sairangarao

pi*D

Is This Answer Correct ?    6 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution

2157


how much to get of BRC lapping in full yield and half yield ?

2548


what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?

2572


what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.

2605


What is the name of this multiplication factors ?

2137


what is the weight of 6000 psi concrete in lb/cft?

3623


Why the finite element method is lower bound solution?

2975


What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?

2719


in staad ,why we realease a moment of a member ? what is affect if we realease a moment

2261


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

2243


How much cement and water required for cement selery????

1957


Which is the latest version of solidsworks?

1253


at which depth the construction of tunnel is economical from cost and engineering aspect.

1776


a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.

13402


is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.

1952