Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What are the possible causes of REF operation on a power
transformer

Answer Posted / jaimin modi

actually i dont know the answer but i wanted to know what
is the REF operation of power x'mer...plz explain in detail

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how do u gauge the size of the cable ?for eg. consider a 300 sqmm L.T Cable.How do u determine the size of the cable seeing it pratically?

2163


Can anybody just suggest about the scope of Electrical design with ETAP software?Just guide me?

3862


What types of CMOS memories have you designed? What were their size? Speed? Configuration Process technology?

3741


There is any especial requirement for motor to drive through with VFD?

2651


how is the cable tray designed & how its total length is calculated for an Industrial plant Say for Ex. (500KW Motor Load)

1940


How many types of colling system it trformers?

1217


what will be the maximum winding temperature of 6.6kv HT motor 450kw, Full load current 49A. 50Hz Frequency.

3287


Explain RLC circuit?

1230


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

2084


what is smart grid? why we use it? explain in detals bcoz i want give presentatin from it....

2002


1. what is usage for power factor in industries?? 2.why we need to monitor power factor??

8390


Write the analogous electrical elements in force current analogy for the elements of mechanical translational system.

1327


WHY EARTHING NOT NEEDED IN BATTERY IN SUBSTATION

2017


hi guys please tell me the procedure for mesuring the coil resistance of 3ph induction motor?

1943


How do I calculate/select Droop CT ratio for various capacity of generators?

3707