Answer Posted / nilesh ghadge
M-30 IT MEANS THE COMPRESSIVE STRENTH OF THAT CONCRETE IS
30N/MM2 AT 28 DAYS
Is This Answer Correct ? | 13 Yes | 0 No |
Post New Answer View All Answers
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
What is the release of lien?
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
Howmuch bend to be provide for 200/600 BEEM
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
Explain the various stages of the project planning process in construction?
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
what are the challenges of being a team leader and a supervisor?
load combinations how many types for staad design purpose?
What year was the keystone power plant in Indiana County constructed?
How much cement and sand required for 9"brick wall per square metre
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
What is the difference between Grade I, II and III of GSB?