What do you mean by "M-30"?

Answer Posted / nilesh ghadge

M-30 IT MEANS THE COMPRESSIVE STRENTH OF THAT CONCRETE IS
30N/MM2 AT 28 DAYS

Is This Answer Correct ?    13 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members. 

2960


How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?

4611


what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.

1955


What is the release of lien?

776


how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend

1674






Howmuch bend to be provide for 200/600 BEEM

1300


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

1734


Explain the various stages of the project planning process in construction?

806


If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in

1683


what are the challenges of being a team leader and a supervisor?

3426


load combinations how many types for staad design purpose?

1815


What year was the keystone power plant in Indiana County constructed?

820


How much cement and sand required for 9"brick wall per square metre

2578


is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.

2015


What is the difference between Grade I, II and III of GSB?

2042