Hi, Please tell me the ISI specification for the duration
of concrete to achieve full strength of concrete. Is it
28days?
Answer Posted / t.nandini
it gvs 100% strength in 28 days
| Is This Answer Correct ? | 1 Yes | 16 No |
Post New Answer View All Answers
Explain what are the skills required to become an architect?
what does the track parameter mean in staad.pro?
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
What is the difference between tor steel and tmt steel?
How will you reduce the concrete flow after mixing the concrete
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
I need to constructive work in amaraj batteries
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
What is the coeffiencent Friction Angle between Steel and Ashphalt?