Answer Posted / ashvin
1) Minor Bridge
2)Major bridge
3) Cable stay bridge
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
give me the rate analysis for Bituminous Macadam and SDBC
what is difference between GTS bench mark and temporary bench mark
Define Workability ?
Who designed the city of washington dc?
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
Calculation of curtain wall of box culvert
pls give me ans to ACT formula cube testing porpuse
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
afe or not