Answer Posted / srsaru991
Basically work center category decides the capacity (means
ability to do work). The category defines the activity type
for costing and scheduling the categories mainly we come
accross in the production are labour and machine. Hence to
define labour cost, machine cost and setup cost we define
work center category to create work center and we enter
defaults therein. For a period of time if there are no much
changes we generally prefer production line, and if there
are much changes in the production we prefer activity type
for individual order which we call production order. By
this you can understand cat type 001 for machine and cat
type for labour.
Work center category used to define which screen selection
& field selection for a particular work center.
OP40 is the T. Code for Work Center Category.
| Is This Answer Correct ? | 8 Yes | 3 No |
Post New Answer View All Answers
When you mistakenly enter wrong master data for an equipment, how do you manage this?
what do you mean by measuring point?
What is completion confirmation?
What is planned maintenance?
What is service entry sheet? Why it is important for plant maintenance module?
Why manufacturer field is important in equipment master and functional location master?
What is work centre category?
What is the purpose of user status in notification? As a consultant what do you recommend to your client on the use of this facility?
What do you understand by horizontal and hierarchical data transfer?
Which table would you use to extract the equipment hierarchy installed under functional location?
Which task lists are object based?
You want to activate change documents functionality in order to know who changes pm order. How would you do that?
How pm module is integrated with mm module?
Differentiate between work center and main work center.
Is purchasing information (vendor, date of purchase, etc.) Copied from mm to the equipment when it is being created ?