how to calculate the required qantities of cement, Sand and
aggrigate to prepare 1 Cum of concrete mix 1:2:4
Answer Posted / raaj
Dear sir,
aggregate is more quantity required then sand, then how it is possible?
sand use in per 1 cum=27.14cft
aggrigate use in per 1 cum=13.57cft
kindly clarify i also need the answer for unit wise.
| Is This Answer Correct ? | 2 Yes | 7 No |
Post New Answer View All Answers
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
What is the Null Point of chimney in Power Plant
How can you achieve soil enforcement?
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
How to construct a water sump in a rocky soil?
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
How do you calculate the unit weight of concrete?
why do we not deduct volume of steel to find actual volume of concrete in practical???
can i get hindi version of is codes based on civil engineering?
What is min thickness,min grade of conc & age of PQC ?
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain