Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why indian power system in 11kv,22kv,33kv,66kv,110kv,220kv ?
2) Why ups required dedicated earth?

Answer Posted / rohit pareek

we know the form factor is rms value / avg value is = 1.11
so due to this reason it always in 11 multiple

Is This Answer Correct ?    73 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how can you calculate fault level ?

2398


how was your last weekend.

1791


What products have you designed which have entered high volume production?

2065


can any one tell me about the Extra low voltage systems?From where we give supply to these type of systems??

1921


condition Autotrip facia come on control panel of electrical transmission line?

1578


How does a battary stores charge in it? please explain in simple manner and in detail.thanks

1984


How capacitor improves pf

1719


I need the recommended size for a 3 phase transformer at 13.8 KV Primary and connected loads of 3000 kVA at 4200 volts and 2375 kVA @ 480 volts AC.

2033


what is meaning of 230volts ac 50hzs ac supply is it rms or maximum to getting ac 230v what amount of max voltage they will send

2070


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

2031


Is it possible to connect a safety device in to parallel?

2157


Haw to check conductivity of budbar

1804


How will A Medium voltage circuit breaker(11 kV voltage level) operate under short circuit fault condition whether It is having short circuit release like Low voltage circuit breaker or relay should be given?

1948


Why we used 690V in ACS 800 drives.Why dont use standard voltage like 415v or 1.1Kv

2458


No load tap changing transformer working

1656