if PQRSTU implies QRSTUV then ABCDEFG implies what?
Answer Posted / soni
bcdefgh
| Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
A person with some money spends1/3 for cloths, 1/5 of the remaining for food and 1/4 of the remaining for travel. He is left with Rs 100/- . How much did he have with him in the beginning ?
Starting from point A, Jayant walked 15m towards west. He turned left and walked 20 m. He then turned left and walked 15m. After this he turned right and walked 12m. in which direction is Jayant from X and how far has he walked from point X?
x:y=3 and x+y=80 what is the value of y?
A bus started from the bus stand at 8Am and after staying 30 minutes at a destination return back to the bus stand. The Destination is 27 miles from the bus stand . The Speed of the bus is !8mph . In the return journey the bus travels with 50% fast speed. At what time it is return to the bus stand
A piece of cloth costs Rs 35. If the piece were 4m longer and each meter costs Re 1.00 less, the cost would remain unchanged. How long is the piece?
If the vertex (5,7) is placed in the memory. First vertex (1,1) ?s address is 1245 and then address of (5,7) is ----------
in a mixture, R is 2 parts, S is 1 part. in order to make S to 25% of the mixture, howmuch R is to be added
if a=2, b=3, c=6 Find the value of c/(a+b)-(a+b)/c
A chain is broken into three pieces of equal lengths containing 3 links each. It is taken to a backsmith to join into a single continuous one . How many links are to to be opened to make it ?
The day before yesterday was WEDNESDAY then the day after tomorrow is?
If 10x coins are added to the no. of original coins he has (5y + 1) times more coins. Find out how many coins he had originally in terms of x and y
A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.
Integral ET(epsiolan transpose)*sigma*dV P=strain displacement vector Q=stress-strain deformation Find [K]
What is the selling price of a car? If the cost of the car is Rs.60 and a profit of 10% over selling price is earned.
how would you connect 8 dots with 3 lines.