Answer Posted / k.prakashchandra
Please note that this applies to large generators in which
the field the rotor and there will be two slip rings called
as 'collector rings'. The usage of shunt resistance for
measurement of field current is not possible in brushless
gen
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
When we use air circuit breaker, it has O/L protection ,time delay SC protection, Instataneous SC protection & ground fault protection. They all have some setting range. But what is the suitable/allowable setting for the above protection which will be safe for the equipment? For example-O/L protection setting have a range of (0.4,0.45,0.5,0.55,0.6,0.65,0.7,0.8,0.9,1.0)xIn Time delay SC protection have a range of (1.25,1.5,2,3,4,6,8,10,12)xIn Time delay setting is 0.02,0.1,0.2,0.3,0.4 Instataneous setting is fixed to 20xIn Gound fault setting is given 100A,300A,600A,900A,1200A This setting are for 2500A ACB. So what will be the basic allowable setting for the above protection? is there any formulae to calculate this<
thyristor controlled APFC panel design parameter?
What is meant by coupling capacitor?
Define what is difference between fuse and breaker?
explanation of mesh bus bars
how to commissioning the genset with amf panel?
stand by earth fault protection (51G) for transformer rating 2000 kVA,Dyn11,33/0.400 V. LV NCT ratio and necessary resistor and metrosil values how to calculate
In motors how many types of cooling systems were used?
1600 KVA ka transformer hi aghar lt side par 800A aur voltage 420 ho to HT side ki cable ki rating keya ho gi?
how to calculate the cable current ratingand and how much of distance the rating will be ok will the distance is incresed what the action we take
What would be the size of wire used for 2 Ton of window A.C?
what is the maximum permissible limit value of leakage current and leakage counter reading to replace lightining arrester?
What is transformation ratio what it describes?
mention hazard experienced during installation
In hydel power plants, L.A's, S.C's are placed inside the control panel boards. what is the purpose? [already the total body was earthed to ground.]