Answer Posted / sjtbehera
question is not understand
lap bar of bore culvert
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
who to find building iron rod strenth
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
What will be weight of 0.5mm GI sheet per sq.ft?
The mixture of different ingredients of cement is burnt at?
mix design procedure for 1:6 cement mortar
For the construction project what capital cost has to be taken in consideration?
What is the difference between linear dimension and aligned dimension?
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
What type of tensile strength is handling by crank in beam? Thanks.
in design case of structural member best suitrable percentage of steel limit is what
Define block?
How to do base isolation using ETABS software?