why we are condecting the slump test for concrete?
Answer Posted / t.arulkumar
The slump test is conducted to find the workability of concrete.
| Is This Answer Correct ? | 44 Yes | 0 No |
Post New Answer View All Answers
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
How many are the types of joints?
WHAT DLC DESIGN IN CONSTRUCTION
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
Is there the dry coefficient of cement is constant?
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
What are the composition of a landfill?
in design case of structural member best suitrable percentage of steel limit is what