Answer Posted / jagdish narayan
Before proceeding for the testing all the test cases should
be prepared and requirement should be maped. Also the test
case should be reviewed internally and externally(client).
Then we have to wait for code moves into QA(Test) region
to start the testing. Mean time we can prepare the test
data for the test cases which is required.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
How would you prepare the test plan without srs?
Explain what is bug triage?
What is difference between qa, qc and software testing?
How do you define a format of writing a good test case?
What are the defects found in testing banking domain?
Explain cmm?
Explain paradigms for interfacing module?
What are the tools used by a tester while testing?
What actually a SQA Tester do in His/ Her first (entry level) Job?
Enlist some of the key challenges that are faced while performing software testing.
What is maturity level?
Hi , We have urgent opening for Test Analyst to our UK client. So testing Professionals Please visit www.sohumsolutions.com & in career setion you can get all requirement specification If you are interested onsite oppertunity Please email me your CV & along with your current salry details & expectation,Visa Status. If you don't have any Visa want to take UK Visa then we can cooperate you ! Thanks & Regards, Prabha Koshti Director Sohum STAFFING Solutions contact+91-(020)27610012 Mobile:+91-(0)-9822914878 Email :prabha.koshti@sohumsolutions.com
what is the difference between product and process based projects?
what are the tables in testcases?
What is the rule of a "test driven development"?