Answer Posted / karthick
in order to inject emf for slow down to rated speed
| Is This Answer Correct ? | 1 Yes | 6 No |
Post New Answer View All Answers
Dear sir, In our plant have Station Transformer having capacity,i want to know, why LV side 40 - 40MVA is given? & how we can get 6.3 KV supply from tertiary(i.e. Open delta connection), Vector Group YNyn0 - yn0 +d MVA Rating 80MVA / 40 - 40MVA + 26.7MVA Voltage rating 420 (Tap range +6,to -10)81.25% /11.5KV - 11.5KV +6.3KV
In HI POT test what is reason for applying the AC VOLTS and DC VOLTS in different applications what is the nessesity for this ?
How to calculate the electrical load for a standard telecom BTS shelter and choose the DG set capacity for the same load?
I am inpecting a 10kVA UPS what tests should i do and should i observe?
What is routh hurwitz stability criterion?
what does mean of RCT and STR in diffrential CT?
what is Fault level? why it is calculated? how will u decide same for our plant?
What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.
what is magnetizing current test in power transformer
How to calculate per unit impedance of transformer?
what are the stresses in circuit breakers ?
Why efficiency in thermal power plant is low?
In siemens S7-300 PLC, what is function and function block ? What is the difference between them ? When to use function and when to use function block ?
What is excitation in case of dc motor?
How to select the cable and voltage drop in circuit?