What are the components ofan HT panel in a 11kv power
station?
Answer Posted / manoj
The HT panel is the front side (usually) of HT cubicle. If
it is a local control panel there will be one alarm
annunciator ,meters for the indication of different
parameters of electricity ,normal control push
buttons,emergency control push buttons,bypass key for all
interlocks,"local,remote or maintenance" selector rotary
switch,semaphore indicators for CB/isolator/earthing
switch,push button for healthy checks of tripping coils
(before closing and after closing).There wiil be no
hazardous HT voltages as the name indicates,only control
power(110 dc,110 ac,240v ac,440v ac).Inside the cubicle
there will be ,space heater,resistances,fuses,SMPS power
supplies auxiliary relays(protection panel) etc.
| Is This Answer Correct ? | 21 Yes | 6 No |
Post New Answer View All Answers
how ups works ? various parts of ups and working principle
draw the full wave and half wave circuit of 3 phase system and inverter circuit used in upsĀ
in 6.6 kv vaccum circuit breaker vaccum bottole vaccum capacity ????
I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.
what is the difference between switch yard to residential area.and how much required it.
can the measured percentage error during calibration of single phase energy meter be negative?
What should be the magnetic balance test values for a 3 phase delta/star connected single primary dual secondary winding transformer (90 MVA / 2 X 45 MVA TRANSFORMER)
hi can anyone pls tell me the eee interview core questions asked in l&t
What is the loss of power of transformer 220kv/33kv,63/80mva of % imp12.05 at 80%load
what r the checklist while installing 500 kva transformer
what will happen if earth of 33 kv cable (earthed system) is not connected to earthing pit?
How the PF control while running DG set with load
1.Can we use 6.6/11KV 300sq mm xlpe 3core cable for LT use (415 Volt). 2. If we use it for LT then what is the current rating
What are the ratings of VCB, MCB, MCCB, SF6, ACB, and OCB?
What is mason's gain formula?