How to get cinema chance?

Answer Posted / k.venkat harish

hi sir this is venkat i am studying degree 2nd year sir am
intrested in acting so plz give me one chance i will provit
my tallent so i requesting u thanking u sir.......... my
cell no.9704340672,,,,,,,,my email..venkatt67@gmail.com

Is This Answer Correct ?    8 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

pile load testing procedure

1847


what is the difference between natural draught cooling tower and induced draught cooling tower

1915


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2036


what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.

2239


What is the difference between shear and tensile strength?

764






For making a new road in a village having a school & hospital , tell the steps of construction systemically ?

1261


why we can use dust in concrete insted of fly ash

1785


how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?

2216


Define line type?

773


what is the minimum cement content for M20 & M25 as per is code -456(2000).

2785


Formula of mid span bar

1550


Why Is Propping Required For Long Structures Once The Form Work Is Removed?

778


Explain creep?

780


please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches

2219


a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.

12861