Answer Posted / dinesh borkar
to calculet quantity of r.c.c column with this formule
L*B*H WHERE L=lenthof column , B=with of column , & H=higet
of column
| Is This Answer Correct ? | 62 Yes | 5 No |
Post New Answer View All Answers
(Project Management Topic) What are the important criteria in the successful realization of the project?
how to shuttering is used in slab
What is the difference between routing maintenance and major maintenance in school facilities?
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
Which are the top apps for you civil engineer?
What are the different theories of failure under static load?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
What is the l/d ratio of cantilever beam?
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
What are the alternate material for steel, Sand and aggregate
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
what is project?
what does the grad of cement shows (denotes)?