Hi, Please tell me the ISI specification for the duration
of concrete to achieve full strength of concrete. Is it
28days?
Answer Posted / guest
100%
Is This Answer Correct ? | 1 Yes | 14 No |
Post New Answer View All Answers
What is the withdrawal force of steel nails?
is concealed wiring a problem in fly ash brick wall?
Why is concrete cube test carried out?
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
Define What is the tallest man made structure in the world?
in design case of structural member best suitrable percentage of steel limit is what
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
what is the difference between prime coat and tack coat in road construction
Differentiate orthographic and isometric projections?
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.
Which brick is best for construction ,either fly ash or AAC BLOCKS
Define the various stages of the project planning process in construction.
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.