What are the causes of failure of foundations and remedial
measures?
Answer Posted / santo okello
There are various causes of failure of foundations;viz
1-Uneven loading of the structre.
2-poor selection of the foundation due to wrong or lack of
soil analysis
3-poor drainage system within the site.
Remedies
1-for uneven loading,during design state,live and dead
loads should be carefully distributed by introduction of
columns,beams.
2-proper soil analysis should be carried out,this will give
the inside of the type of foundation to be adapted for a
particular structure.
3-for poor drainage,this can be avoided by proper leveling
of the site prior to construction,use of land drains or use
of water repellant cement for the foundation concrete
| Is This Answer Correct ? | 25 Yes | 4 No |
Post New Answer View All Answers
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
Define What is unit weight of normal concrete?
What is the meaning of a blue land surveyors flag?
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
How can you achieve soil enforcement?
Define What is rigging?
how pumping of concrete effects the quantity of material used in it?
What is absolute coordinates?
What is the minimum size of the particles of silt soil?
what are the duties of Site Engineer in work site?
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m