Answer Posted / srinivasarao.n
nothing to say there is no question,
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
What is the difference between Grade I, II and III of GSB?
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
what radial pressure, the NP2 class rcc pipe can sustain?
What is the difference between engineering stress and true stress?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
In cement making,what is meaning of blend,fineness,density.
Explain major differences between routing maintenance and major maintenance.
material used for mendrel use to bend epoxy coated rebar
Explain what is Hybrid Foundation?
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
what is the use of beam end forces while using a staad ? wha they are show
what is mean by reestimation?
What is Heavy Concrete & Normal Concrete
Define What does civil status mean?