Is it required to use 2 nos of body earthings to any machine
though if we use TP with E supply is provided to Machine?
Answer Posted / sindhanaiyalan
As per IE rule all three phase loads required 2 earth for
protection.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is the constructional difference between a power transformer and potentian transformer?
What is the lower limit of break-down voltage of converter transformer.
i need the details about bhel exam.how to apply for that.please send to my email-id.thenmozhi2k7@gmail.com
HOW TO WORK A VFD?SAY SIMPLE METHOD
What tests should i carry over on a newly rewinded DC Generator with voltage rating of 38 volts and current rating of 350 amps, to certify that the machine is OK?
What is the feedback in the control system?
we have two generators different capacity on 15 MW and other 6MW at 11 KV , 15 MW gen. bus short level current 40KA,and 6MW short level current 25KA,, length of cable 100MTR between 6 MW from 15MW gen. for bus coupling . kindly tell any one can we use both NGR OR one NGR from any GEN. BOTH NGR has diff. rating. Tariq pakistan
what are the values of VRY,VYB,VBR,Vry,Vyb,Vbr,Vrn,Vyn,Vbn for Magenetic balance test of 100 KVA and 63 KVA Distribution transformer
what is W.T?specify the acceptable range?
Discuss the effect of sudden loading of an induction motor
A Generator is in running condition and Rotor earth fault alarm is coming.How to check on line(i.e in running condition) whether there is actual earth fault in rotor or not.
we have 15 ampere variyac but we want 30 ampere variyac what we do
Whar is the KvA rating of 33Kv substation & actual kv rating of power generaating station.
hey guys i scored 910 on GRE and 67 on TOEFL respectively.I have an aggregate of about 74%in my B tech.For which colleges should i apply for an MS program in electrical engineering.I am looking for colleges in NJ,SC,NC,GEORGIA, NY. Please reply with a good response.....
1600kva capacity Transformers how the bucholz relay,Oil temperature,winding,surge relay relays setting are to be done