wsm is uneconomical as true behavior of material is not
taken into consideration.it consider upto only elastic
limit,so 100% strength of material is not achieved.
in lsm behaviour of material upto failure is taken into
account hence whole strength is utilised.
| Is This Answer Correct ? | 45 Yes | 9 No |
Post New Answer View All Answers
explain what do you mean by the property development.
What are the phases inspections are done by local authority while construction?
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
how to calibrate the RM 800
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
what is the weight of 10mm,20mm,40mm aggregate
how much area can be platered by a mason for exterior
What is a kip?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
Gidc technical que paper
can you provide a link for manual design of building?
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?