Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Hi, Please tell me the ISI specification for the duration
of concrete to achieve full strength of concrete. Is it
28days?

Answer Posted / purushotham reddy

it is a continious procedure ...concretre attains full strength at infinite time....but it achives 60-70% in 7 days and around 90% in 28 days

Is This Answer Correct ?    20 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3

2083


how to find ssm in foundation?

1929


What are some facts about concrete?

1160


WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?

2450


What is oneside mat. And explain 

2581


Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?

6425


Pls help me to arrive the rates for centering shuttering for highbay using H-frames?

2346


how i can tak Quantity of mortar in block work

2381


Why are pull-out tests performed for soil nails?

1159


How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)

2244


What is Refuse Area In High Rise Building ?

2153


types of laps in column

2360


i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI

2354


1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25

2767


States some of the tool bars used in cad?

1190