Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is clean Earth System ?

Answer Posted / william lobo.

Actually this question should be posted in instrumentation
questions. Nevertheless the answer goes like this. Normal
earthing is connected with the electrical apparatus in the
PIB ( Plant interface building) or any such building
wherein instuments or electronic equipment are installed.
The earthing of these electronic equipment are connected to
a different earthing system which consists of a flat plate
with insulators. From here the earthing goes direct to a
seperate earthing pit and thence the other end of the
earthing pit may then be connected to the ground bus. Never
are any electronic earth connected to the electrical earth
or these electronic sensitive equipment will get damaged.

Is This Answer Correct ?    23 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why can the rotor of 3 phase slip ring induction motor not be a 2 phase rotor?

2056


Dear sir, In our plant have Station Transformer having capacity,i want to know, why LV side 40 - 40MVA is given? & how we can get 6.3 KV supply from tertiary(i.e. Open delta connection), Vector Group YNyn0 - yn0 +d MVA Rating 80MVA / 40 - 40MVA + 26.7MVA Voltage rating 420 (Tap range +6,to -10)81.25% /11.5KV - 11.5KV +6.3KV

2162


How 48-relay (incomplete sequence) functions?

4091


Is there a possibility to use such a treshold voltage for the NMOS part of a CMOS circuit that during the switching it will start conducting only after the PMOS part will be already closed, by this eliminating the leakedge current? Please note, I'm not asking about the well bias in standby mode, but about the "antileakedge" measures during normal operation.

2063


When calculation of fault current and fault Kva is to be done,why always we use per unit value and why we consider the base kva?

1897


if we apply 1000ADC instead of 100ADC or We apply 50ADC instead of 100ADC,What will be happened in the test result value.Pl explain

1293


What is the typical enclosure type used for Indoor switchgear / Outdoor switchgear Units? - In Onshore / offshore Units?

992


if a.c supply is given to the motor,, what happen?

2145


how r charge carriers produced

2076


how to decide no of electrodes for 1600A LT Main incomer panel

1654


and gate circuit diagram,amplifier circuit diagram

2062


In CTs tan delta point should be earthed , what is the reason behind it?

3019


WHAT IS FAULT CAPACITY OF HT MOTOR TERMINAL BLOCK? ANY BODY HAVE ANSWER PLZ....POST IT.

2182


can anyone show me how the 3 phase power is supplied to socket outlets?

2016


Explain Creepage Distance of Insulator

2206