Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what are the standard & nominal size of brick

Answer Posted / arvind.b

Std. Size 19x9x9 cm

Nominal size 20x10x10 cm

This is the right answer for any interviews.

Is This Answer Correct ?    44 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate canal slope curvature qty!

1993


why & what is perchatage we are using fly ash in concrete?

2722


what is civil engineer greatest strength and weakness?

13885


How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)

1860


How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site

1695


What is an ice dam sock?

1130


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

2153


what do you mean by yeild stress of a material? What will happen when hit is given to cement?

2337


silt%= silt volume/ silt+sand volume is this right?

2019


What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?

1882


how to estimate material requirement for an area of house in square feet?

2325


how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?

2189


Why are steel plates inserted inside bearings in elastomeric bearings?

1152


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2082


What is rate of concrete surface rendering work per sqm

1998