Answer Posted / britto john baskar.a
Green,because it indicates yes to all.
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
A moves 3 kms east from his starting point . He then travels 5 kms north. From that point he moves 8 kms to the east.How far is A from his starting point?
a circular track has 100yards. The race of Rabbit and TOuttoise. they started at same point. and move in circular path. in opposite direction.first tortoise run for 1/8 th path, then only rabbit starts,rabbit moved slowly till tortoise meet him, Rabbit had covered 1/6 th distance speed( over earlier speed) to win
One clock ringes 7 O'clock in 7 sec.In how many seconds it will ring 10 O'clock.
A chain is broken into three pieces of equal lengths containing 3 links each. It is taken to a backsmith to join into a single continuous one . How many links are to to be opened to make it ?
one question has last part like difference between two terms is 9 and product of two numbers is 10, what is the squares of sum of numbers?
Find the hypotenuse of a right angle isoceles triangle whose area is 50.
What is the missing number in this series? 8 2 14 6 11 ? 14 6 18 12
I most like to work with? Most men act though?
which country is following one party system
in a railway station, there are tow trains going. One in the harbour line and one in the main line, each having a frequency of 10 minutes. the main line service starts at 5 o'clock. the harbour line starts at 5.02a.m. a man goes to the station every day to catch the first train. what is the probability of man catching the first train
Placement aptitude questions pattern in oyo rooms
If 4 circles of equal radius are drawn with vertices of a square as the center, the side of the square being 7 cm, find the area of the circles outside the square?
A can do a piece of work in 20 days, which B can do in 12 days. In 9 days B does ¾ of the work. How many days will A take to finish the remaining work?
A can do a work in 8 days, B can do a work in 7 days, C can do a work in 6 days. A works on the first day, B works on the second day and C on the third day rely. that is they work on alternate days. When will they finish the work.(which day will they finish the work) (7+7/168)
A batsman scores 23 runs and increases his average from 15 to 16. Find the runs to be made if he wants top Inc the average to 18 in the same match.