Answer Posted / sajjad rasool
what is the defenation of CBR
| Is This Answer Correct ? | 4 Yes | 11 No |
Post New Answer View All Answers
construction workers how much time take one work or qty
what is the Asfalt test?in road constraction..?
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
How to marking the building
what is meant by csr in foundation? what is sbc?what is meant by contour line?
During reclamation how can the occurrence of mud waves can be rectified?
Will going from a 3-tap to 6-tap increase water pressure?
What is the cost difference between site mix and ready mix concrete per cubic meter
Is there the dry coefficient of cement is constant?
what is thumb rule for calculating the size of ISMB required for a particular length of span
What is labor and material payment bond?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.