HOW TO RUN SEVERAL TESTS AT A TIME USING TEST DIRECTOR ?
WITH OUT USING AUTOMATION TOOL?
(FOR EXAMPLE IF I GIVEN 20 TESTS TO TESTDIRECTOR FOR
RUNNING PURPOSE IN TODAYS NIGHT I WANT TO CHECK THE TEST
RESULTS NEXT DAY) HOW TO DO THIS ?
Answer Posted / ramarao
click the run test tab,after that click on tset set builder,
u can set wt testcase u can require for running, take on
keep into one folder after taht wt testcases u have
required for runnning ,all of them put in same folder wt
ever u want.After that u can click on run tab it will be
executing.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the main purpose of storing requirements in test director?
Is there any possibility to restrict duplication of defects being created in td?
Hi All, Im currently getting to grips with the Document Generator in Test Director and have a query. We use TD to link requirements to test cases and I am attempting to produce a report which lists the requirement and the test case it is linked to. I cant see a way to do this as the test case link info resides on the Coverage page and it appears the only field available to display for requirements reports within document generator as those on the 'details' tab. Any tips?
How many versions are there in Test Director.
What databases can test director reside on?
How to generate the graphs in test director?
Explain the procedure of connecting testdirector in qtp?
How do I run reports from test director?
how many ways are there to copy test cases in test director
Can we export the files from test director to excel sheet? If yes then how?
What is the difference between master test plan and test plan?
What are the drawbacks of TD??
What are the 3 views?
How to use testdirector in real time projects?
How can we add requirements to test cases in test director?