what is the difference between built-up area & carpet area?
how to calculate this areas?as there are any formula to
calculate these areas?
Answer Posted / k.jayavijayan
The term `Plinth Area'( Built-up Area) refers to the entire
carpet area along with the thickness of the external walls
of the apartment. It obviously includes the thickness of
the internal walls and the columns, if any, lying within
the four walls of an apartment. The commercial space is not
taken into account in calculating the plinth area.
The term `Carpet Area' refers to the total usable area
within the four walls of an apartment or a commercial
space, as the case may be. In other words, it refers to
the area for which a carpet can be laid if required by the
owners.
and finally the term `Super Built-up Area' refers to the
plinth area of an apartment or a commercial unit as added
by the balconies and other common areas like corridors,
staircase, lift room, motor room, security room, meeting
hall, gymnasium and an area reserved for indoor games.
| Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
why we use 19x9x9and 20x10x10 but not other
What is Gsb tollens ?
What is .Dwg?
60-70 grade of Bitumen is VG-30 ?
How to find beam R/F cutting length
Describe a time when you anticipated potential problems and developed Preventive measures
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
What is a bearing capacity of soil?
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
in design case of structural member best suitrable percentage of steel limit is what
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
how much cement and sand required for 1cum rr masonry
What are the common ways of demolition?
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?