how to consider the lap length of a bar in IS code and
specify the code book name and clause& page number?
Answer Posted / jayavijayan k
Lap Splices :
Lap Splices shall not be used for bars larger than 36mm
dia. For larger diameters, bars may be welded. In case
welding is not practicable, lapping of bars larger than
36mm may be permitted, in which case additional spirals
should be provided around the lapped bars.
Lap Length in Tension : lap length including anchorage
value of hooks in flexural tension shall be Ld or 30D
whicever is greater and for direct tension 2Ld or 30D
whichever is greater. The straight length of lap shall not
be less than 200mm, whicever is greater.
*Ld - Development Length
Lap Length in Compression : The lap length in compression
shall be equal to the development length in compression
calculated. But shall not be less than 24D
Bars of Different Diameter : When bars of wo different
diameters are to be spliced, the lap length shall be
calculated on the basis of diameter of the smaller bar.
SOURCE : SP34 Hand Book on Concrete Reinforcing and
Detailing --- Clause 4.4.2 lap splices.
Is This Answer Correct ? | 14 Yes | 4 No |
Post New Answer View All Answers
construction workers how much time take one work or qty
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
Time required for curing of wall tiles before fixing
what is tension footing?
How much material will consume for following specification water tank (9*7.5*6 feet)?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Define What is made from large rocks, which protects the base of cliffs?
How will be cutting in timber plate size 600*400 column size
The concrete slump recommended for beams and slabs; is?
what is idealized curve for concrere and steel
how much one carpenter can doing shuttering of slab in one day
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
How to increase a bearing capacity of soil?
What is the difference between Hinged and pinned in Column ends
Explain what is structural frames or systems?