what is the difference between rcc pipe (pressure or non-
pressure)and rcc hume pipe?
Answer Posted / bhupinder singh
Non presure pipes (NP1,NP2,NP3) can bear only water presure
upto 0.7kg/cm2 with maximum head of 7mtrs while the presure
pipes (P1,P2)can bear presure more than 0.7kg/cm2 with the
head of more than 7mtrs.
| Is This Answer Correct ? | 26 Yes | 1 No |
Post New Answer View All Answers
How much quantity water should be placed in one cubic meter area?
The largest size of paper used in plotter to print the drawing made by Autocad .
how to estimate material requirement for an area of house in square feet?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
Which is the direction of negative angle?
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
For a washout valve why are two gate valves required in normal practice?
what is civil engineer greatest strength and weakness?
five benefits of using standard terminology in the measurement process
how can i calculate cement in brickwork
what is called Bulk Density of aggregate?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is the difference between shear and tensile strength?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?