give me some example for high severity and low priority
defect?
Answer Posted / sujan reddy
I have modules like I)Accounts II)Reports
Requirement:
The Account details which were entered in the Accounts
module should be reflected in the reports module.
High severity:the accounts information which were entered
in the accounts module is showing right values in the
accounts module but those values are not reflected in the
Reports module.its a high severity and high priority bug
but in some situations that Reports module is not fully
implemented and that was in the development stage than it
will be considered as high severity and low priority bug.
| Is This Answer Correct ? | 17 Yes | 11 No |
Post New Answer View All Answers
Want to learn Manual Testing in just two days? Students around Thanjavur, Trichy, Mayavaram and Kumbakonam Mail to manualtestingtraning@gmail.com. Entire Manual Testing Concept. Any doubt regarding IT Job please mail above ID
Can anybody give me some tips on how to face telephonic interview and Write some expected telephonic questions as a 2+yr exp. in testing. Try to give Ques. that u already hv faced in telephone. Plz Help me out friends.
What is Test Design?
How would you test a service oriented architecture (soa) web application?
what is independent question and what is retriewing and what is problem of severity.
What are the RBI rules has to follow by a bank for online precesseing. ?
hi can anyone tell me about vision plus testing? and what about its future
What are the two main categories of software testing?
What is Application Performance testing and Operational performance testing
What are the different ways of doing black box testing?
What exactly you do as a Configuration controller?
what is prototyping model,RAD model V model, spiral model?????
Why would we not include these?
How we will do Memory Testing? There is any tool to do that testing and to whome this testing to be performed?
There is only requirements document. You have 10 days and 8 resources to release the system.At the end of the 8th day u tell ur TL that system is ready for release. How will you proceed with the testing process or in other words what all approach you will follow once you get requirements