Answer Posted / tanuja
1) cost of ply what we are going to use for work i.e.,
water proof/commercial and thinck ness depends nature of
work plus 2) wood cost for making i.e type of wood 3)
Making cost 4) fixing&removing 5) P&M 6) No of repetations
are will give the cost of shuttering
| Is This Answer Correct ? | 31 Yes | 10 No |
Post New Answer View All Answers
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
What is need for setting limits?
how to find hardness of water?why it should be determined?
length where bent up is made in slab of bridge from one end
what is the meaning of degreasing of the euipment or line.
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
Detection of a beam & a girder areββββ
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.