Answer Posted / tanuja
1) cost of ply what we are going to use for work i.e.,
water proof/commercial and thinck ness depends nature of
work plus 2) wood cost for making i.e type of wood 3)
Making cost 4) fixing&removing 5) P&M 6) No of repetations
are will give the cost of shuttering
| Is This Answer Correct ? | 31 Yes | 10 No |
Post New Answer View All Answers
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
How high should the water tank be to provide a 60 psi at base of this water tower?
who to find building iron rod strenth
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
what is parametre for M25 after 7 days strength
very simple or less time consuming formula for reinforcement calculation by moment
what is hydrostatic paradox?
What is absolute pressure? How absolute pressure is calculated?
plz.show development and anchorage length in simple diagram.
What is soil enforcement?
All aptitude question of Bechtel
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....