solution for the question: NOON+MOON+SOON=JUNE, each alphabet
represents the number. what is the answer? what does JUNE
represents?
Answer Posted / girish br
June represents No.6
| Is This Answer Correct ? | 22 Yes | 10 No |
Post New Answer View All Answers
PROCESS FLOW IN LOGISTICS
15 software functions are there. It is known that atleast 5 of the m are defective. What is the probability that if three functions are chosen and tested, no errors are uncovered.
What is the probability of getting a sum 9 from two throws of a dice?
A finish the work in 10 days. B is 60% efficient than A. So hoW days does B take to finish the work?
a number of subsets of a set s is 128, then s has
In a two-dimensional array, X (9, 7), with each element occupying 4 bytes of memory, with the address of the first element X (1, 1) is 3000, find the address of X (8, 5).
modulo(373,7)+round(5.8)+truncat(7.2)-round(3.4) = ? i exactly don't remember the truncate function.but the function was where we skip the '.' part.
the matrix of a(7,9) was given.the address of the first byte of a(1,1)=1258.it takes 4 bytes to store the nuymber. then calculate the address of the last byte of a(5,8)
How can 1000000000 be written as a product of two factors neither of them containing zeros
The number 0.05 is what percent of 20?
L:says all of my other 4 friends have money M:says that P said that exact one has money N:says that L said that precisely two have money O:says that M said that 3 of others have money. P:Land N said that they have money. all are liers.Who has money&who doesn't have?
three clocks where set to true time .First run with the exact time ..second slows one minute/day. third gains one minute/day. after how many days they will show true time.
Rahul took a part in cycling game where 1/5 ahead of him and 5/6 behind him then total number of participants?
A power unit is there by the bank of the river of 750 meters width. A cable is made from power unit to power a plant opposite to that of the river and 1500mts away from the power unit. The cost of the cable below water is Rs. 15/- per meter and cost of cable on the bank is Rs.12/- per meter. Find the total of laying the cable.
58,27,12,x,2,1. Find x.