Answer Posted / loboreliance2003
P&ID is Process and Instrumentation Diagram. This is most
important for any process especially related to chemical,
petrochemical plants. It is also known as Piping and
Instrumentation Diagram since in this is mentioned the
various pipelines, valves, instruments location and also
electrical especially control room related.
| Is This Answer Correct ? | 56 Yes | 9 No |
Post New Answer View All Answers
the output of the common trasmitter protocol in qatar gas are the following
What is the PLC configuration in Cement industry?
all types instrumentation questions want
you must show the examples application and give at least 4 types of transducer/sensors that can minimize the failure during the manufacturing of the resistors.
what are the steps I have to deal with?
Instrumentation Safe Guarding test. How to determine the interval time of the test. eg:Halfyearly,Every year,Every three years etc.
Why flow/pressure transmitter before control valve?
what is basic difference between motion balance and force balance in pneumatic instrument?
In turbine, what does term CDP, NI, NH, HSSOC, means
how u choose thermowell lenght n pnumatic C/v size?
Explain the mechanism behind the turbine meter.
how u calibrate pneumatic n motorized c/v?
Regarding , there is an air cooler which control the fans(50% of AV FANS) by temperature in outlet , and the louver of Air cooler is controlled by HIC from control system , So if on Air cooler we will consider 2 individual I/P converter or positioner?
HOW TO SOLVE PROBLEM WITH ENRAF LEVEL TRANSMITTER 854 ATG THAT PASSWARD DO NOT Exist INTO TRANSMITTER TO ADJUST LEVEL WITH PORTABLE PET 847, WRITTEN WRONG PASSWORD , I AM SURE THAT DEFAULT PASSWARD (W2=ENRAF2) IS THIS TRANSMITTER NEED TO REPLACE SOFTWARE AND HOW?
Square root calculation for dp flow transmitter?