What"s mean by water bound macadam road(WBM)?
Answer Posted / manish vikram singh shekhawat
Water Bound Macadam (WBM) is a base corse and mixing of
binding material such as mooram, Cley soil etc. A layer of
Stone By Grade (90mm to 63mm or 63mm to 40mm) and compress
to it as a Dry Roll by Roller and than alayer of binding
material placed on it and Fully water than again compaction
by Roller
Is This Answer Correct ? | 296 Yes | 31 No |
Post New Answer View All Answers
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
What do you mean by tolerance factor of concrete ?
all technical question
What is change order request?
types of survey and levelling instrument ?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
how to caliculate required amount of cement and sand required for 1cu.m.
Would you cause a 55-gallon drum of water to weigh more by climbing in?
what motivates you to do a good job
Wats the formula of eccentric footing and how was calculated from concrete qty
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
How to take labor charges for construction of 1cum of concrete?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
How much time Required for PPR pipe network testing
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?