BOQ
s.no description of work l b h no qty unit rate totalamount
1 soilexcavation 5 5 5 1 625 m3 200 12500
| Is This Answer Correct ? | 5 Yes | 5 No |
Post New Answer View All Answers
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
Dear Sir What is the Contraction joint for base Slab
Define What is the distance between railway tracks?
how many type of admixtures for water stored structure?
In a concrete grade C35A, C & A stands for what and equalent cube strength?
Sir how to find cutting length for footing steel bars in the shape of "u"
how to conversation of all construction material in to brass
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
What is demising walls?
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
what are the Task work of different labour.?
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
Define What is an ice dam sock?
Use of coping on terrace wall and in 4" wall is compulsory or not ?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post: