Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHERE IS THE LIGHTING ARRESTER SHOULD BE PLACED IN
DISTRIBUTION LINES?

Answer Posted / gautam moitra

Lightning arrestor should be placed before and after of HT
isolator of incoming line of any distribution system as BIL
is less compared to any other HT equipment so as to protect
the other equipments if lightning stroke occurs.

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can a generator runs after getting 1st stator earth fault.

1473


what is the chiller and working principal

2381


State kirchoff voltage law?

1177


why EMF IS INDUCED IN A CONDUCTOR WHEN FLUX LINKING WITH IT CHANGES ACCORDING TO FARADAYS LAW.

2073


what is quality factor in series resonance circuit and calculate the factor of voltage magnification? how it happens?

2018


what is the efficiency of thyristor

1690


please I wont know how to calculate the vector group for power transformer ZNyn11 best regard.

1917


Give atleast 20 alternating current apparatus and devices.

1817


what is difference between bus coupler and auto transfer switch

4262


What is meant by vector group

2623


In a flange coupling, the flange bolts are designed for

1168


how indusrial diesel generator work

1959


what is the ms flat constant for calculating earth mat design calculation?

2570


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2883


how copper and aluminium wires or cables are choose for current rating? please provide copper and aluminium wire selection chart for different current rating ?

2102