Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is meant by Anchorage length? Development Length?

Answer Posted / trevis

anchorage lenght is the lenght of overlap of the bars into
each other the lenth is 45times into dia of bar

Is This Answer Correct ?    12 Yes 66 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)

1998


Define What is the best type of wood glue?

1152


how we check the thickness and line of ceiling plaster.

2664


What is rolling stock

2349


Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.

1917


Can we apply curing compound on ceiling (slab Bottom)

770


how much tempareture are required to make liquid state of pid leed

2216


Which brick is best for construction ,either fly ash or AAC BLOCKS

1010


I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.

2314


List out the types of roofs?

1152


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

2130


Which stone is best for wall construction Laterite Stone or Cement Blocks

1865


How to calculate volume of concrete & steel on tank foundation & ring wall ?

1574


1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.

2294


When column of building is abutting the boundary line,then suitable footing advised is

2567