Answer Posted / muthu krishnan
It considered only depends upon the grade of steel and
tensile strength of the steel.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
where i can get material costs on weekly basis
how can calculate the compressive strength of concrete cylinder by water cement ratio ?
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
Bernaullis theorem deals with the law of conservation of mass momentum energy none
what does the track parameter mean in staad.pro?
What in your past experience or education prepares you for the position for which you are applying
what is right & short method of measurement of slab&beam
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
crank types
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
What is the basic difference between OPC
How much cement and water required for cement selery????
What are the materials used in building a gravity dam?