Answer Posted / amar
new:when the bug has been found and not approved
open:Approved by the team lead
assigned:Assigned to a developer and fixing in process
Need more info:project need some more information
fixed:bug has solved and it is not validated
closed:validated and fix the bug
deferred:bug for the future it has placed
rejected :not a genuine bug
duplicate:the same bug has been placed by the tester two times
invalid:it is not bug
Reopened:even after fixing the bug repeating
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
Explain how does a test coverage tool work?
What is sei - software engineering institute?
Which one you prefer, working with independent testing project or working along with development team?
What is the difference between test matrix and traceability matrix?
What is fault masking explain with example?
I am asked to create Usability testing methodology document, basically listing the Procedures & methodology to/for: a. Entry criteria Exit criteria for usability test b. Deliverables d. Methods of doing Reviews and inspection e. Methods of Reporting f. at which testing phase usability testing is done in v model Is there any sample document/template available on Internet? Any help will be greatly appreciated.
How do you verify the test results and how do you proceed when you do not get the expected results?
Example: A Bank teller determines a need for a new software that displays customer information on her screen. What would using a Waterfall Methodology look like AND what would an Agile Methodology look like in creating this software product?
What is the information that should be covered in test plan?
What is api (application programming interface)?
What is code review?
how cam www sites be tested
What is clear box testing?
I am going for an interview for back end and ui testing. Can smone tell me some important questions?
Which one of the following activities is the most efficient and most cost effective at identifying defects? 1. Prototyping 2. Unit test 3. Beta test 4. Design/code inspection 5. Risk analysis