Is there any Institution (Not AMIE)for giving B-Tech/M-tech
in Electrical engineering for those who r in service? Give
the details please.
Answer Posted / sanjay singh
RAJASTHAN VIDYAPEETH
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is grid collapse? what is the reason for it?
show the single line diagram of star delta starter with single phase preventer
Determine the BTU size of an aircon for 20 sq metre room
how to estimate wiring ins roughing ins. and boxes
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
sir, 3phase induction motor takes different pf and different KW in three phase while running,explain reason
What is K-rated transformer? What is the use of it? What can be the size(pls provide calculation if possible) of K- factor transformer for 550kW,690V motor operating with drive (VFD)?
PLEASE SEND THE PREVIOUS YEARS QUESTION PAPERS OF RRB JUNIOR ENGINEER-ELECTRICAL
I WANT YHE TECHNICAL AND ELECTRICAL SPECIFICATIONS OF 2x4MW 11KV 2x10MW 11KV 2x25MW 11KV 2x100MW 11KV HYDEL POWER PLANT i.e PROTECTION SYSTEM,MONITORING,CONTROL SYSTEM,GENERATION,SYNCHRONISATION,METERING PLEASE SEND THE DETAILS TO MY MAIL ID SPRAVEEN_222@YAHOO.CO.IN
battery capacity use of made?
how indusrial diesel generator work
why it is not advisable to run low rating (19KVA) DG sets in parallel for long durations even though they are provided with droop ckts (QDC)
I have two PLC processors. I want to communicate both processor with each other. How i can do so?
Why 9KV surge arrester having 7.65KV of MCOV?
I am designing new project sub station with 220 kV / 11 kV, 40 MVA capacity. This project have many recifier sets, which can generate 3rd harmonics. Now I have to select vector group of This transformer. To minimise 3rd harmonics, what care should I take in selection of Transformer Vecrtor group? If it is Y-Y with open Delta tertiary then what should be the rating & voltage of Tertiary Winding?