If we know the N - Value of soil and required bearing
capacity how do we know what diameter and length of pile to
be casted?
How can we check whether the dia. and lenght of pile we
have selected are most economical onse?

Answer Posted / sandipsawant36

300MM

Is This Answer Correct ?    0 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?

1435


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1471


When column of building is abutting the boundary line,then suitable footing advised is

1961


How to plan a project

1723


Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)

1468






how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????

1452


In cement making,what is meaning of blend,fineness,density. 

2984


how to nfind out the specific gravity of sand.aggregate,water please help...

1694


how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?

1347


what is the calculation of raw material for 0.35cum of m-15

1044


How many square meter can a worker/labor demolish a structure per day?

1526


Reinforcement details at hinged joint

2695


what is idealized curve for concrere and steel

1844


What is the significance of cost estimate knowledge for an architect?

1155


what is E VALUE FOR WOOD

1534