A 16 stored building has 12000 sq.feet on each floor.
Company A rents 7 floors and company B rents 4 floors. What
is the number of sq.feet of unrented floor space.
Answer Posted / shraddha
60000
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
In a cycle race there are 5 persons named as J, K, L, M, N participated for 5 positions so that in how many number of ways can M make always before N?
One passage was on playing cards. know how many diamonds and etc.
mukesh and anil ambani invested amount in business and made in the ration 17:13 and made some profits. if mukesh earned 800 rs more than anil. then what is the profit they have earned....?
A Father Has 7 Pennys With Him And 1 Water Melon Is For 1p, 2chickoos For 1p, 3 Grapes Foe 1p. He Has Three Sons. How Can He Share The Fruits Equally?
In a journey of 15 miles two third distance was travelled with 40 mph and remaining with 60 mph.How much time the journey takes...
A pipe can fill a tank in 30 min B can fill in 28 min then if 3/4 th of tank can be filled by B pipe and after wards bothare opened then how much time is required by both the pipes to fill the tank completely. note: the values of A and B may slitely vary be ware.
A work is done by the people in 24 min. one of them can do this work a lonely in 40 min. how much time required to do the same work for the second person.
If VXUPLVH is written as SURMISE, what is SHDVD?
205 of 6 liter solution and 60% of 4 liter solution is mixed What percentage of the mixture of solution
With a 4/5 full tank a vehicle can travel 12 miles, how far can it travel with a 1/3 full tank
5) DB2 maintains information about the data a) In Tables b) In a set of tables known as DB2 catalog c) In DB2 database d) None of the above
vernacular : place : : fingerprint : ?
i attended sbi clerical interview on28/04/10.on 20/08/10 i called sbi headoffice 022-22024619 they said tht final result will be declared after 2 months.i also had another no 022-22826300.if anybody are interested cal those no's.my mobile no is 9010347790(udamsingh)
An array was given and we were required to write a function : int CalculateThirdHighest(int a[ ]) : which calculates the third highest number in the array. While coding in C remember to calculate the length of array using formulae length of array=sizeof(a)/sizeof(int). Because the number of elements of array were not passed as argument. i want a solution in C/C++ language
Rajdhani Express starts from Delhi at 12:00 pm and reaches Chandigarh at 2:30 pm and Doronto Express starts from Chandigarh at 12:15 and reach at Delhi at 2:15 . What will be the time when both the trains will cross each other?