Answer Posted / shaikh parvez
Approximately 1:.75:1.5
| Is This Answer Correct ? | 5 Yes | 7 No |
Post New Answer View All Answers
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
What you understand by building codes?
why development length = 50D . why not 100D
In the roof of a pumping station explain briefly the components of a waterproofing system?
What is the Hardness of M-40 grade concrete, general and theoratical
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
How to calculate Volume of Wet cement concrete for a specific grade?
How do you calculate the power of centrifugal pump?
Formula for calculation volume of essentric footing
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
What is the biggest dam in america?