Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Explain bug life cycle

Answer Posted / santhosh k

Bug status description:
These are various stages of bug life cycle. The status
caption may vary depending on the bug tracking system you
are using.

1) New: When QA files new bug.

2) Deferred: If the bug is not related to current build or
can not be fixed in this release or bug is not important to
fix immediately then the project manager can set the bug
status as deferred.

3) Assigned: ‘Assigned to’ field is set by project lead or
manager and assigns bug to developer.

4) Resolved/Fixed: When developer makes necessary code
changes and verifies the changes then he/she can make bug
status as ‘Fixed’ and the bug is passed to testing team.

5) Could not reproduce: If developer is not able to
reproduce the bug by the steps given in bug report by QA
then developer can mark the bug as ‘CNR’. QA needs action to
check if bug is reproduced and can assign to developer with
detailed reproducing steps.

6) Need more information: If developer is not clear about
the bug reproduce steps provided by QA to reproduce the bug,
then he/she can mark it as “Need more information’. In this
case QA needs to add detailed reproducing steps and assign
bug back to dev for fix.

7) Reopen: If QA is not satisfy with the fix and if bug is
still reproducible even after fix then QA can mark it as
‘Reopen’ so that developer can take appropriate action.

8 ) Closed: If bug is verified by the QA team and if the fix
is ok and problem is solved then QA can mark bug as ‘Closed’.

9) Rejected/Invalid: Some times developer or team lead can
mark the bug as Rejected or invalid if the system is working
according to specifications and bug is just due to some
misinterpretation.



Is This Answer Correct ?    13 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is dynamic analysis?

1023


What is a user interface?

999


What is coverage measurement?

1163


Hi..I want testing in worker compensation claims.. if anyone have real exp..can you explain it for me.. thanks

1895


What is a vertical microinstruction?

1048


What is the maximum length of cable supported in SCS-1,2 and 3?

1751


What is path analysis?

1205


What are enter & exit criterias of a test paln?

1206


What is the difference between model based testing and state transition testing? Or are they the same?

2556


iam searching job on testing if u know any references are openings plz forward mee

1885


What is system simulation?

995


What is top-down approach?

1137


Explain functional testing?

1058


What is a technical analyst?

999


What r all the risks u r facing while doing a project?

2319